HY industries

Installation service

install service

With multiple dedicated installation teams and installations across the country, we place great emphasis on cultivating strong customer relationships and are committed to delivering consistent service excellence throughout the end-to-end process.HY Industries guarantees to provide high-quality products and unparalleled services to all partners.

The construction process of the footbridge

Professionals participate in the whole process from RTK (real-time dynamic survey)/total station measurement and positioning, geological map matching, pile foundation point confirmation, compound ruler, and stakeout to ensure data accuracy.

One-stop service for the entire industry chain

Explore More

Industrial trails——

Oppein Workshop Operating Platform

Oppein’s workshop operation platform has an aluminum structure that perfectly replaces the steel structure. The two products with the same paving height are suitable for different scenarios and have a humanized design.

blueprints
Factory operation process
Workers working in a factory
Factory Ladder made with aluminium grating
Inside the hy factory

Curtain wall category——

YOFC Optical Fiber Industry Building

Aluminum grating as a flooring material
Workers working at the site

Petrochemicals——

Jingbo Petrochemical

The top platform, vertical ladder, and small platforms on the second and third floors of Jingbo Petrochemical tank are designed as an aluminum structure. The platforms are softly connected to prevent dust from accumulating. Angle aluminum columns are specially designed for petrochemical use and are easy to install.

Workers working on site
workers working

Petrochemicals——

Xinshengyuan rotating ladder

In a strong alkali environment, carbon steel and stainless steel products will rust seriously, so the aluminum alloy plate structure is used, and the design table.
The surface is made of weather-resistant natural oxidation to cope with strong corrosive environments and enhance the service life of the aluminum alloy.

HY stair tread

Civil bridge category——

Zhenghe Fushan Trail

Workers installing materials on site
Engineering Design Drawings
Bridge case detail

contact us

Telephone

647-829-8288(North America)

09 215 99644 (New Zealand)

+337 66626446(Europe)

+61 280113011(Australia)

 

address

Milton,Ontario,Canada,L9T 5V7

Morrin RoadMt. WellingtonAuckland

6 Rue des Chauffours 95000 Cergy

19 Clapham Rd,Regents Park,NSW,Australia,2143

Mail

cody.cong@hyindustry.com

jackyhu@hyindustry.com

chauveau@hyindustry.com

ian.yang@hyindustry.com

Drop us a line